IE TRAP ® Arc Flash Detection System (Single Power Source), UL Certified
$31,999.00
$25,999.00
Remediation (using IE TRAP® products by ZMAC) protects electrical workers from injury and prevents destruction of equipment.
> The arc flash detection system trips an upstream device upon detection of arc flash light. > The trip signal assertion is accomplished in 1mS. > It is possible in most cases to remediate the complete substation to several calories depending on transformer size and upstream device performance. > System facilitates full coordination (in other words adequate time separation between TCC curves) in most substation protective relay schemes. > System does not require maintenance mode or low instantaneous settings that in other designs can allow elevated risk and nuisance tripping. > Outputs include dry contacts for pick up by SCADA system (PLC, DCS, etc.) for control room monitoring of trip events and system ok. > Pre-engineering and detail engineering resources are available on request to create: project documents (SOW, TCCs, etc.), protective device setting review with recommendations, sensor location layouts, commissioning, and additional construction support. > NEC, NFPA-70E, OSHA - Aligns with the intent of NEC articles related to Arc Energy Reduction, the NFPA-70E (standard for electrical safety in the workplace), and OSHA. > Contact us for more information regarding this product. > This is a cost effective best-in-class plug-and-play system.
> No PC is necessary and no arc flash relay adjustments are necessary for optimal performance.
Quantity
Only 2 left in stock
Delivery Lead Time
Note that delivery is estimated to take place 40 business days following the order. If a shorter lead time is required please contact us as it is possible to expedite. Shipping cost will be added depending on client destination.
Features
This item includes a complete working system with six (6) optical point sensors, support for arc flash energy calculations, support for sensor placement, support for upstream protective device wiring/settings, and includes one (1) day commissioning in the continental USA (lower 48).
Out puts: > Shunt trip signal for upstream breaker (hi current hi speed hybrid contact) > Active arc flash event (dry contact, 1NO/1NC) > Arc flash system OK (dry contact, 1NO/1NC) > Audible signal on panel to annunciator system not OK














