top of page

IE TRAP ® Arc Flash Detection System (Double Power Source), UL Certified

SKU ZMAC-IETRAP-AFDS-02
Price

$42,999.00

Remediation (using IE TRAP® products by ZMAC) protects electrical workers from injury and prevents destruction of equipment.

> The arc flash detection system trips an upstream device upon detection of arc flash light.
> The trip signal assertion is accomplished in 1mS.
> It is possible in most cases to remediate the complete substation to several calories depending on transformer size and upstream device performance.
> System facilitates full coordination (in other words adequate time separation between TCC curves) in most substation protective relay schemes.
> System does not require maintenance mode or low instantaneous settings that in other designs can allow elevated risk and nuisance tripping.
> Outputs include dry contacts for pick up by SCADA system (PLC, DCS, etc.) for control room monitoring of trip events and system ok.
> Pre-engineering and detail engineering resources are available on request to create: project documents (SOW, TCCs, etc.), protective device setting review with recommendations, sensor location layouts, commissioning, and additional construction support.
> NEC, NFPA-70E, OSHA - Aligns with the intent of NEC articles related to Arc Energy Reduction, the NFPA-70E (standard for electrical safety in the workplace), and OSHA.​
> Contact us for more information regarding this product.
> This is a cost effective best-in-class plug-and-play system.  

> No PC is necessary and no arc flash relay adjustments are necessary for optimal performance. 

Quantity

Only 3 left in stock

Delivery Lead Time

Note that delivery is estimated to take place 40 business days following the order.  If a shorter lead time is required please contact us as it is possible to expedite. Shipping cost will be added depending on client destination.

Features

This item includes a complete working system with twelve (12) optical point sensors, support for arc flash energy calculations, support for sensor placement,  support for upstream protective device wiring/settings, and includes one (1) day commissioning in the continental USA (lower 48).

Out puts:
> Sub 1 shunt trip signal for upstream breaker (hi current hi speed hybrid contact)
> Sub 1 arc flash event (dry contact, 1NO/1NC)
> Sub 1 arc flash system OK (dry contact, 1NO/1NC)
> Sub 1 Audible signal on panel to annunciator system not OK
> Sub 2 shunt trip signal for upstream breaker (hi current hybrid contact)
> Sub 2 arc flash event (dry contact, 1NO/1NC)
> Sub 2 arc flash system OK (dry contact, 1NO/1NC)
> Sub 2 Audible signal on panel to annunciator system not OK

bottom of page